Control Rooms

New Hindhead Tunnels Upgrade

Surrey, UK

Download this project profile as a PDF

Overview

Located on the A3 road linking London to Portsmouth, the Hindhead tunnels provide a safe route through the Devils Punchbowl, a site of special scientific interest and a notoriously high accident rate. In order to help improve roadway efficiency and heighten safety, Electrosonic provided the orginal videowall installation for the tunnels when they first opened in 2011. Electrosonic has now upgraded the system, with higher specification videowall projection cubes.

South Mimms - Highways Agency

South Mimms, UK

Download this project profile as a PDF

Overview

During 2015, Highways England expanded the capability of its Eastern Regional Control Centre at South Mimms. With their existing dynamic display system reaching its tenth year in operation, a superior replacement was required in order to cope with increased operational demand. The Eastern Control Centre has 20 operator positions, of which, four are designated for training and two, which are in a separate room are used during major incidents. Images can be selected from approximately 870 cameras.

Highways England's Eastern Regional Control Centre

South Mimms, UK

Download this project profile as a PDF

During 2015, Highways England expanded the capability of its Eastern Regional Control Centre at South Mimms. With their existing dynamic display system reaching its tenth year in operation, a superior replacement was required in order to cope with increased operational demand. The Eastern Control Centre has 20 operator positions, of which four are designated for training and two, which are in a separate room, are used during major incidents. Images can be selected from approximately 870 cameras.

Tom Bradley International Terminal at Los Angeles International Airport (LAX)

Los Angeles, California

Download this project profile as a PDF

The new Tom Bradley International Terminal at Los Angeles International Airport (LAX) offers passengers a unique travel experience with its Integrated Environmental Media System (IEMS), a series of seven digital media features integrated into the interior architecture. Electrosonic was tasked by Los Angeles World Airports (LAWA) with the engineering and system integration of the IEMS components, and the build out of the IEMS control room.

Santa Barbara County Emergency Operations Center

Santa Barbara, CA

Download this project profile as a PDF

The County of Santa Barbara’s Emergency Operations Center (EOC) helps the county maintain a state of readiness to manage emergencies swiftly and effectively. Before its construction, the county operated without a dedicated facility, resulting in several hours of setup before operations were functional. Now, the new EOC features extensive audio, video and data support provided by Electrosonic to facilitate the sharing of information from various internal and external sources, such as news media, incident maps, live video streams and operational reports.

Caltrans District 7

Los Angeles, CA

Download this project profile as a PDF

Caltrans District 7 called upon Electrosonic to upgrade the audio-visual system at its Los Angeles facility with a new videowall that takes advantage of the latest in projection technology. Used for traffic monitoring, the videowall comprises a 12-screen center unit in a 4x3 configuration flanked by a pair of 6-screen 3x2 units. The giant wall features 80-inch diagonal screens in the center and 52-inch screens on the sides.

Bristol Water

Bristol, UK

Download this project profile as a PDF

The UK’s Bristol Water is responsible for the water supply in the Bristol area for nearly 1.2 million people, covering a 926 square-mile region. After working in a cluttered workspace with a system developed piecemeal over the last two decades, Bristol Water decided to completely upgrade its operational control room with a new display system that helps provide improved monitoring and more efficient working conditions.

The Weather Channel

Atlanta, GA

Download this project profile as a PDF

The Weather Channel upgraded the primary studio set at its Atlanta headquarters with a new video wall provided by Electrosonic. The new system features 12 LED-illuminated, rear-projection display cubes to be used as a backdrop for on-air talent, and a vehicle for live video and map presentations.

Signal Training on the Victoria Line

London

Download this project profile as a PDF

The Victoria Line on London’s Underground is currently being upgraded with new Rolling Stock, a new Signaling System and new Line Management System under the direction of the Victoria Line Upgrade Team (BCV Upgrades, part of Transport for London).

Derbyshire Police

Derbyshire

Download this project profile as a PDF

In 2010 Electrosonic installed a video wall and image processing system at the Derbyshire Constabulary’s new purpose built control centre. Along with other police forces across the UK, Derbyshire’s security cameras and surveillance control rooms are increasingly central to crime prevention and monitoring of terrorist threats.